In Georgia, swimming pool construction has moved beyond being just an elite luxury item; today, it is an instrument for increasing real estate capitalization. Following the evolution of villa culture in the suburbs of Tbilisi and the coastal zones, a pool has become a basic requirement of residential standards. However, improper budget planning and trusting unverified workers often end in financial loss.

What is the price per square meter to build a concrete pool?
The cost of pool construction is not a static figure; it is affected by geographic location and soil structure. According to 2024 data, the following rates apply:
The starting price for concrete pool construction averages from 125 USD per square meter.
Facilities equipped with premium materials reach 175-250 USD, with an operational lifespan of 30-50 years.
Fiberglass pools cost between 150 and 220 USD, taking 2-4 weeks to install.
Liner (PVC) pools cost 80-130 USD per square meter, lasting 10-15 years.
The most budget-friendly option – frame pools – cost 10-30 USD.
Premium Infinity pools, which require a catch basin, cost between 70,000 and 150,000 USD overall.
How much do pool tiling and equipment cost?
Tiling and technical equipment are major parts of the project. Because materials are mainly imported from Turkey, Spain, and Germany, prices depend on the GEL exchange rate.
The price of glass mosaic starts from 25 GEL per square meter.
A sand filter (e.g., Bestway) costs approximately 850 GEL, while a smaller one is 420 GEL.
A standard pump is priced around 300 GEL.
Heat pumps range from 2,500 to 8,000 GEL.
What is the annual cost of pool maintenance?
Owners must also account for monthly costs. The average annual operating expense ranges from 3,000 to 6,000 USD, covering water, electricity, and chemicals.
Chlorine tablets (90%) cost about 75-80 GEL per 1 kg.
Algaecide costs between 25 and 50 GEL.
pH minus/plus regulators cost 30-60 GEL.
Why Sheniani? (Benefits): In Georgia, the "labor" cost for building a pool often fluctuates between 25% and 50% of the total project value. Often, via subcontractor management, a 4,500 GEL excavation job can inflate to an 8,000 GEL quote. Sheniani.ge protects you from these hidden and inflated markups. You do not call random numbers; instead, you fill out a questionnaire and receive fixed, calculated offers only from verified professionals.The Solution: Building a pool requires geodetic surveys, proper waterproofing, and the use of B30 grade concrete. Our system guarantees that your request connects only to teams with the appropriate engineering competence. Do not turn your pool construction into an endless, expensive experiment.
Plan your budget correctly, compare offers from certified pros, and build with peace of mind.Get Quotes
